Sign In | Join Free | My fnxradio.com
China Suzhou orl power engineering co ., ltd logo
Suzhou orl power engineering co ., ltd
Suzhou orl power engineering co ., ltd Specializing in the production boiler unit China suppliers
Active Member

8 Years

Home > Boiler Super Heater >

Boiler Steam Superheaters Steel , Separately Fired Superheater Once Through

Suzhou orl power engineering co ., ltd

Boiler Steam Superheaters Steel , Separately Fired Superheater Once Through

  • 1
  • 2
  • 3

Brand Name : ORL Power

Model Number : Customization

Certification : ISO9001/SGS/TUV/ASME/EN

Place of Origin : Zhangjiagang,Jiangsu,China

MOQ : 1 Set/Sets 10tons

Price : Contact me | Get Latest Price

Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram

Supply Ability : 500Ton/Tons per Month

Delivery Time : 50~100 Days

Packaging Details : Iron Frame Package

Output : Hot Water/Steam

Condition : New

Dimension(L*W*H) : Customization

Weight : 10~1000ton

Type : Natural Circulation/Once Through

Usage : Industry/Power Station

Structure : Fire/Water Tube

Pressure : High/Low Pressure

Style : CFB Boiler

Fuel : Coal/Gas/Oil-fired, Water Heat

Contact Now

Boiler Steam Superheaters Steel , Separately Fired Superheater Once Through

Boiler Steam Superheaters Steel , Separately Fired Superheater Once Through

Description

The Steam Superheater is a coil type heat exchanger which is used to produce superheated steam or to convert the wet steam to dry steam, generated by a boiler. It is different from a boiler in a way that, boiler utilizes both sensible heat as well as latent heat to convert water into steam while superheater utilizes only sensible heat to superheat the steam in order to increase its enthalpy.

Specifications

Description Superheater
Material Alloy steel, Carbon steel etc.
Material standard ASTM, EN or ISO etc.
Structure Type Tube Coil
Dimension Customization
Supply ability 500 ton per month
Manufacturing process Material→Ingot → Hot/Cold-Rolling→ Heat treatment (Normalizing+ tempering) → Inspection →Bending tube→Assembly→Inspection →RT→Heat treatment (annealing)→Hydraulic pressure test→Painting→ Packaging
Thermal Efficiency Around 95%

Boiler Parts

Boiler Super Heater,Boiler High Temp Superheater,Boiler Cyclone Separator,Boiler Flue,Boiler Heat Pipe Air Preheater,Boiler Gen Bank,Boiler Heat Pipe Elements,Boiler Tube Pin,Boiler Tubeshield,Boiler Ditch Tube

Name&Type Supply Ability: FOB Price
Boiler drum 100Ton/Tons per Month Contact Me Get Latest Price
Boiler header 100Ton/Tons per Month Contact Me Get Latest Price
Boiler waterwall panel 500Ton/Tons per Month Contact Me Get Latest Price
Boiler economizer 500Ton/Tons per Month Contact Me Get Latest Price
Boiler super heater 300Ton/Tons per Month Contact Me Get Latest Price
Boiler air preheater 300Ton/Tons per Month Contact Me Get Latest Price
Other 300Ton/Tons per Month Contact Me Get Latest Price

Company Information

Suzhou ORL Power Engineering Co., Ltd.is located in Suzhou, Jiangsu Province.

ORL Power is a leading company and exporter of industrial boilers,power plant boilersand boiler parts (including steam drum, membrane waterwall panel,header,economizer, evaporator, superheater,H-fin economizer, spiral fin tube, air preheater, heat pipe, flue etc.), seamless steel tubes/pipes and ERW steel pipes.ORL provides our customer with full range of services including boiler design, fabrication, installation and commissioning, boiler maintenance, and supervision at site. Our product and service include design and manufacture industrial boilers, pressure vessels and tanks, and pressure parts for power plant boilers (600MW, or 1000MW).

Boiler Steam Superheaters Steel , Separately Fired Superheater Once Through

Product Description

Boiler Steam Superheaters Steel , Separately Fired Superheater Once Through

Boiler Parts

Boiler Drum,Boiler Waterwall Panel,Boiler Economizer,Boiler Header,Boiler Cyclone Separator,Boiler Chimney Flue Pipe,Boiler Air Preheater,Boiler Air Preheater

Boiler Steam Superheaters Steel , Separately Fired Superheater Once Through

Boiler Parts

Boiler Super Heater,Boiler High Temp Superheater,Boiler Cyclone Separator,Boiler Flue,Boiler Heat Pipe Air Preheater,Boiler Gen Bank,Boiler Heat Pipe Elements,Boiler Tube Pin,Boiler Tubeshield,Boiler Ditch Tube

Production Workshop

Boiler Steam Superheaters Steel , Separately Fired Superheater Once ThroughBoiler Steam Superheaters Steel , Separately Fired Superheater Once Through

Boiler Product Test

Impact test,The scene to examine the water-wall,Industrial TV monitoring,Snake-like pipe water pressure test,Header endoscopic detection,Header weld inspection

Testing Center

Boiler Steam Superheaters Steel , Separately Fired Superheater Once Through

Packaging & Shipping

Boiler Steam Superheaters Steel , Separately Fired Superheater Once Through

Certifications

Boiler Steam Superheaters Steel , Separately Fired Superheater Once Through

We have our boiler manufacturing plant, and obtain ISO9001:2008, ISO3834, ASME S, U and GB stamp.

Company Business

Our products have been wildly used in power plants and large international companies overseas.

Such as USA, Brazil, Porto Rico, Guatemala, Spain, Demark, Norway, Turkey, India, Korea, Australia, Middle East, Southeast Asia etc.

Trading Process

ORL offers prompt response, professional products, and all-around service to our customers. Our experienced sales team and engineers are waiting for your enquiry and ready to provide sincere service. We cordially welcome domestic and overseas friends to visit our company and manufacturing bases, and look forward to building up long-term, mutual cooperative relationship with you.

FAQ

1. Why choose us?

We are boiler and boiler parts(boiler drum, boiler waterwall panel, boiler economizer, boiler header, boiler cyclone separator, boiler flue pipe, boiler air preheater, boiler pipe, boiler tube)manufacture and we are one of the best suppliers in China.

We ensure the deliver time, high quality, and the best after-sale service for you.

2. How to order?
Welcome come to our factory for inspecting and discussion the technical details.

Contact Information

  • Phone:+86 0512-56770166
  • E-mail: info@orlpower.com
  • Website: www.boiler-units.com
  • ADD: 11 East Renmin Road, Zhangjiagang City, Jiangsu, China

Product Tags:

convective superheater

      

superheater tubes

      
Wholesale Boiler Steam Superheaters Steel , Separately Fired Superheater Once Through from china suppliers

Boiler Steam Superheaters Steel , Separately Fired Superheater Once Through Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Suzhou orl power engineering co ., ltd
*Subject:
*Message:
Characters Remaining: (0/3000)